EU Grant Extends Medusa Cable to Jordan

The European Union will fund an €11.1 million extension of the Medusa submarine cable system from its Egyptian landing point to Jordan, strengthening digital links between Europe, North Africa and the Middle East.
The grant, channelled through the European Investment Bank (EIB), was announced on 19 November. It will support the terrestrial extension from Medusa's landing point in Port Said, Egypt, to Jordan, with a particular focus on research and education.
The extension was announced at the Aqaba Digital Hub during the Jordan-EU Investment Conference, where EU Commissioner for the Mediterranean Dubravka Šuica attended the National Water Carrier Project ceremony alongside Prince Faisal on 18 November.
Separately, the EIB is supporting Medusa across the Mediterranean with a loan of up to €60 million. The new grant builds on €40 million in EU funding already awarded through the Neighbourhood Investment Platform for a dedicated research and education subnetwork, bringing EU grants channelled through the EIB for these connections to €51.1 million.
Linking 500 research institutions
Working with GÉANT, Europe's research and education networking organisation, the project aims to connect around 500 institutions in the Southern Mediterranean with their European counterparts, making it easier for universities and research centres to exchange data, collaborate on scientific projects and access digital resources.
“Reliable digital connections are essential for innovation, economic resilience and cooperation,” said EIB Vice-President Gelsomina Vigliotti. “With Medusa, we are supporting infrastructure that brings Europe and its Mediterranean partners closer together.”
EU Commissioner for the Mediterranean Dubravka Šuica said faster, more reliable connections would make it easier for researchers at SESAME and for students and scientists at Jordanian universities to share data and work on joint projects with their European peers.
An 8,000-kilometre network across the Mediterranean
Medusa is a submarine cable system developed by AFR-IX Telecom, a Spanish wholesale telecommunications and infrastructure operator. The project supported by the EIB comprises more than 8,000 kilometres of cable and 21 landing points, linking Portugal, Spain, France, Italy, Malta, Greece and Cyprus with Morocco, Algeria, Tunisia, Libya, Egypt and the recent incorporation of Syria, alongside the extension to Jordan.
Its first phase, connecting France, Morocco and Tunisia, is complete and already providing services. The EIB loan is supporting the second phase, for which cable deployment is under way.
The system uses the latest generation of European submarine cable technology, with 24 fibre pairs and an open architecture designed to provide substantial additional capacity. It will support advanced digital services, including 5G, cloud computing and artificial intelligence. Medusa is a flagship project under Global Gateway, the EU's strategy for sustainable and trusted infrastructure.