The Daily Byte
Breaking
Welcome to The Daily Byte — real stories from across Pakistan.
Monday, 23 November 2026 · Pakistan

The Daily Byte

Stories from Pakistan that deserve to be heard
Minor World

ExxonMobil Approves $4bn Angola Kizomba Oil Project

By The Daily Byte ·23 Nov 2026 ·3 min read
Offshore oil production platform in open sea off Angola

ExxonMobil and its partners have approved an estimated $4 billion investment to redevelop Angola's Kizomba A and B oil fields, in a final investment decision that extends the life of one of the country's most productive offshore areas.

The decision was formalised on 19 November 2026 and announced the following day by Angola's National Agency of Petroleum, Gas and Biofuels (ANPG). It completes the investment decisions for the Block 15 Life Extension Project, following approval of the Kizomba C redevelopment in 2025.

What the $4bn covers

The investment covers the redevelopment of the Kizomba A and Kizomba B fields, alongside development of the Likembe field, using existing offshore infrastructure about 145 kilometres off Angola's northern coast. The aim is to unlock additional resources from ageing deepwater fields and sustain output from a block that has produced oil for more than two decades.

ExxonMobil operates Block 15 through its affiliate Esso Exploration Angola (Block 15) Limited, which holds a 36 per cent participating interest. Its partners are Azule Energy Exploration (ANG) Ltd with 24 per cent, Azule Energy ANG BV with 18 per cent, Equinor Angola with 12 per cent, and state-owned Sonangol E&P with 10 per cent.

The partners' production-sharing agreement for Block 15 has been extended through 2037. Brian Unietis, ExxonMobil's managing director in Angola, said the extension, alongside approximately $4 billion in planned new investments, positions the consortium to keep generating value for Angola, its partners and shareholders.

A new discovery in Block 15

Alongside the investment decision, the partners announced a hydrocarbon discovery at the Tchihumba West-01ST1 exploration well, the 21st recorded in Block 15 and the second announced in the area this year.

The well, drilled by the Valaris DS-9 rig in about 1,400 metres of water around 350 kilometres north-west of Luanda, found about 65.4 metres of hydrocarbon-bearing sandstone, according to reports of the ANPG announcement.

Further details on engineering and construction packages and on the production the redevelopment is expected to add have not yet been disclosed.

Why it matters for Angola

Angola is working to sustain crude output from mature offshore assets as older fields decline, and the Block 15 extension is one of the largest commitments to that effort. The Kizomba hub has long been a cornerstone of Angolan production, and the life-extension project is designed to keep it producing well into the next decade rather than letting output fade.

The decision also comes as Angola continues to court investment in its offshore sector, with the regulator presenting the Kizomba redevelopment as evidence that international operators still see long-term value in the country's deepwater acreage.