The Daily Byte
Breaking
Welcome to The Daily Byte — real stories from across Pakistan.
Saturday, 21 November 2026 · Pakistan

The Daily Byte

Stories from Pakistan that deserve to be heard
Minor World

Kenya starts Turkana oil drilling ahead of 1 Dec first oil

By The Daily Byte ·20 Nov 2026 ·3 min read
Kenyan officials and energy workers in hard hats at the Amosing oil field spudding ceremony in Turkana County

Kenya has started drilling for commercial crude oil in Turkana County, taking the country to the verge of becoming an oil producer after years of exploration and pilot work.

Energy and Petroleum Cabinet Secretary Opiyo Wandayi presided over the spudding of the Amosing 1 well pad on Friday, 20 November, at the Amosing 1 and 2 oil fields in the South Lokichar basin. Spudding is the first stage of drilling a well and marks the formal start of operations.

The GW70 onshore rig, leased from China's Great Wall Drilling Company, had been rigged up, levelled and commissioned before the ceremony. Wandayi was joined by Roads and Transport Cabinet Secretary Davis Chirchir and East African Community Cabinet Secretary Beatrice Askul.

First oil set for 1 December

Wandayi confirmed that 1 December remains the date for first oil production, when Kenya moves from exploration and pilot production into full commercial production. President William Ruto is expected to preside over the flag-off of the first consignment, when the official trading name for Kenyan crude will also be unveiled from a shortlist of four names drawn up after public participation.

The project is being developed by Gulf Energy E&P BV SEZ under a US$6 billion plan for Blocks T6 and T7, under production sharing contracts with the national government and a field development plan ratified by Parliament.

The first phase will develop the Ngamia, Amosing, Twiga and Ekales fields, together known as NEAT, producing more than 20,000 barrels per day. The six discoveries in the two blocks carry a best-estimate recovery of 326 million stock-tank barrels over a 25-year contract period. Output is planned to rise to 50,000 barrels per day in a second phase.

Oil to travel by road to Mombasa

Gulf Energy managing director Paul Limoh said first-phase output would be transported by road to Mombasa for stockpiling at Kenya Petroleum Refineries Limited tank farms from 1 December. The company has contracted Baker Hughes to provide integrated well services and SLB to deliver the early production facility.

Kenya's crude is described as a sweet, paraffinic, intermediate oil with an API gravity of 30.5 degrees, to be priced against Dated Brent. The government projects lifetime earnings of more than US$2.9 billion, about KES 371 billion, depending on oil prices and production volumes.

Chirchir said the government was investing more than KES 24 billion in infrastructure such as roads in the oil-producing region. Wandayi described the spudding as a historical milestone and said the government was supporting Gulf Energy and its contractors to meet the targets in the field development plan.